• General carpentry work at job start-up

  • Door and hardware installation

  • Asphalt shingling and roofing

  • Panelized systems

  • Gypsum wall board and metal stud framing

  • Historic preservation

  • Safety, plan benches, temporary barricades, trailer setup

  • Rough carpentry with wood framing, truss framing, and structural framing

Sample Project

Pomfret School

Health and Wellness Center

Putnam, CT

Scope: Framing, roofing, windows, siding, and exterior trim


 

Project Description:

New out-of-ground, the 9,000-square-foot design-build project included a 4,500-square-foot health center along with two facility apartments.

Sample Project

Belmont Day School

The Barn

Belmont, MA

Scope: : Installed all windows for a 26,000 sf field house called “The Barn.” The new space is designed to add more space for students, faculty, and the community.


 

Project Description

“The Barn” building will feature a field house that includes two basketball courts, changing facilities, and a reception area, plus a wing that will include four workshop-style classroom spaces, o‑ces, and meeting space. Inside the field house, there will be two side-by-side dual-use basketball and tennis courts with multiple garage doors that open out to two outdoor tennis courts. The field house is being built as an engineered steel building with an insulated corrugated metal wall system.